PD PORTS – NEW REEFER GANTRY

do you have a construction project we can help with?

Get a free quote

PD PORTS – TEESPORT – NEW REEFER GANTRY

Reefer Gantry Replacement — PD Ports

CB Construction were commissioned by PD Ports to remove and replace a damaged reefer gantry as part of ongoing operational upgrades at the port. The project required full dismantling of the existing structure, followed by fabrication, galvanising, and erection of a new gantry designed to meet modern compliance standards.

Dismantling & Removal of Existing Structure

Our team began by safely dismantling and removing the damaged gantry from site. Working in a live operational environment, the removal was carried out with strict adherence to port safety procedures and with minimal disruption to port activities.

Fabrication, Galvanising & Erection of New Gantry

Following removal, CB Construction fabricated a new steel gantry engineered to current specifications. The structure was fully galvanised to ensure long-term corrosion protection and durability in a marine environment.

The new gantry was supplied complete with:

  • Access stairs

  • Handrailing

  • Roof covering

  • Updated layout to meet compliance requirements

Once fabrication was completed, our teams erected the structure on-site, coordinating lifting operations and installation safely and efficiently.

Ensuring Compliance & Operational Safety

The replacement structure was designed to improve safety, accessibility, and durability, ensuring the reefer gantry meets modern compliance requirements for ongoing operations.

Project Details

DATE

November 19, 2025

CLIENT

PD PORTS – MIDDLESBROUGH PORT

Get A Quote Today

At vero eos et accusamus et iusto odio dignissimos ducimus qui blanditiis praesentium voluptatum deleniti atque corrupti quos dolores et quas.