Able UK – Gable End Infill and Megadoor Installation

Able UK – Gable End Infill and Megadoor Installation

do you have a construction project we can help with?

Get a free quote

ABLE UK – Seaton Port

Gable End Infill, Steelwork Cladding & Megadoor Installation at ABLE UK – Seaton Port

At CB Construction, we specialize in delivering tailored engineering solutions, no matter the complexity. Our recent project at ABLE UK’s Seaton Port facility is a testament to our ability to handle intricate design, fabrication, and installation works.

Full Design & Detailing

Our team worked closely with ABLE UK to provide a complete design and detailing service for the gable end infill, ensuring the structure met all specifications and operational needs. Using cutting-edge design software, we optimized every aspect to ensure maximum efficiency and structural integrity.

Steelwork Fabrication & Cladding

The next phase of the project involved the fabrication of high-quality steelwork, followed by the cladding of the steel structure to the existing building. Our experienced fabrication team worked with precision to create components that were both durable and aesthetically fitting. The cladding installation further enhanced the building’s protection, ensuring it met both functional and visual requirements.

Megadoor Procurement & Installation

A key component of this project was the installation of a state-of-the-art megadoor. We not only procured the door but also coordinated with Assa Abloy and the CB Construction team to ensure flawless installation. The door was installed with exacting standards and was fully signed off by Assa Abloy upon completion, guaranteeing the highest level of quality and security.

Project Highlights:

  • Full design, detailing, and engineering of the gable end infill
  • Expert fabrication and steelwork cladding of the existing building
  • Procurement and seamless installation of a high-performance megadoor
  • Collaboration with Assa Abloy and CB Construction for door installation and certification
  • Completion of the project with minimal disruption to ABLE UK operations

At CB Construction, we pride ourselves on delivering high-quality, tailored engineering solutions. From design through to installation, our team ensures every project meets the highest standards of safety, performance, and efficiency.

If you’re looking for a trusted partner to carry out your next structural or installation project, contact us today!

Project Details

DATE

January 17, 2024

CLIENT

ABLE UK – SEATON PORT

Get A Quote Today

At vero eos et accusamus et iusto odio dignissimos ducimus qui blanditiis praesentium voluptatum deleniti atque corrupti quos dolores et quas.