PD PORTS – NEW REEFER GANTRY
do you have a construction project we can help with?
PD PORTS – TEESPORT – NEW REEFER GANTRY
Reefer Gantry Replacement — PD Ports
CB Construction were commissioned by PD Ports to remove and replace a damaged reefer gantry as part of ongoing operational upgrades at the port. The project required full dismantling of the existing structure, followed by fabrication, galvanising, and erection of a new gantry designed to meet modern compliance standards.
Dismantling & Removal of Existing Structure
Our team began by safely dismantling and removing the damaged gantry from site. Working in a live operational environment, the removal was carried out with strict adherence to port safety procedures and with minimal disruption to port activities.
Fabrication, Galvanising & Erection of New Gantry
Following removal, CB Construction fabricated a new steel gantry engineered to current specifications. The structure was fully galvanised to ensure long-term corrosion protection and durability in a marine environment.
The new gantry was supplied complete with:
-
Access stairs
-
Handrailing
-
Roof covering
-
Updated layout to meet compliance requirements
Once fabrication was completed, our teams erected the structure on-site, coordinating lifting operations and installation safely and efficiently.
Ensuring Compliance & Operational Safety
The replacement structure was designed to improve safety, accessibility, and durability, ensuring the reefer gantry meets modern compliance requirements for ongoing operations.
Project Details
DATE
November 19, 2025
CLIENT
PD PORTS – MIDDLESBROUGH PORT